What this work involves
Start with the space you need in daily life. Place furniture and walking routes on the plan before deciding the external dimensions. A deeper extension is not automatically better: daylight in the existing part deserves equal attention.
- Dimensions and position of the extension
- Existing rear wall and structural changes
- Foundation, floor build-up and connection to the house
- Glazing, rooflights, shading and ventilation
- Kitchen, heating and electrical layout
Use the following design considerations when coordinating this service with a wider project. Agree which parts apply to your request.
Decide whether an addition’s structure becomes a visible interior element.
Which trade-off matters?
An exposed beam makes the construction legible but changes requirements for junctions and services. Compare exposed and concealed solutions using the same structural assumptions.
What the drawing needs to explain
Detail one connection with structural dimensions, visible finishes and adjoining materials. Have required protection measures and service space explicitly assessed.
Decide this before construction
Coordinate the visible detail before producing structural elements. Plan services and finishes early so unwanted boxing does not later surround a deliberately exposed connection.
Cost factors for this service
Size, foundation method, access, structural work and finishes determine the budget. Ask for drawings, installations, demolition and garden reinstatement to be identified separately.
Bring this to the discussion
A floor plan, photographs, approximate dimensions and a short list of requirements.
Questions about the work
Can I stay at home during the extension?
It depends on the work. Discuss when the existing wall is opened, how the house is protected from dust and rain, and which facilities become unavailable.